Kore-Shaqlawa twin tunnels




  • Location : Erbil Governorate, Erbil-Haji Omeran Hoi
  • Total Length : 7 km (2*350 m)
  • Excavation Area : 110 sq.m
  • Main Lithology : Limestone, Shale
  • Excavation Methods : Drilling and Blasting
  • Activities Performed : Design Review of Electromechanical Systems