Salaheddin twin tunnels & approach roads




  • Location : Erbil Governorate, Erbil-Haji Omeran Highway
  • Total Length : 4.9 km (2*2450 m)
  • Excavation Area : 110 sq.m
  • Main Lithology : Limestone
  • Excavation Methods : Drilling and Blasting
  • Main Activities Performed : Design Review of Electromechanical Systems, Side slope stability, Control of Grouting and Inner concrete lining, Tunnel Drainage Systems  

Gallery