Bani Harir tunnels & approach roads




  • Location : Erbil Governorate, Erbil-Haji Omeran Highway
  • Total Length : 7.13 km (2*3565 m)
  • Excavation Area : 110 sq.m
  • Main Lithology : Limestone
  • Excavation Methods : Drilling and Blasting

Gallery