Darbandi-Ranya




Design of Darbandi-Ranya Bridge

  • Location : Sulaymaniyah Governorate, Raniya
  • Super-structure Type : Steel Concrete Composite Girder
  • Sub-structure Type : Two Reinforced Concrete Column Per Bent
  • Foundation Type : Concrete Piles and H-Piles
  • Total Bridge Length : 420 m
  • Number of Spans : 8
  • Width of Bridge: 15 m
  • Main Activities Performed: Feasibility Studies, Value Engineering of Alternatives Cases and Design

Gallery